Featured Project
Clearwater Center – 1100 Cleveland St – Clearwater 15 Story Building

Forristall Enterprises, Inc. was hired to carefully cut and remove brick on a 140’ high façade and CMU wall inside the existing building, utilizing a crane with a basket to collect the brick and using a chute inside the building for CMU wall debris disposal.

The area of the Façade to be demolish is 45,000 SF.
Contract Amount: $641.000.00
Click to view video

Forristall Enterprises was featured this month in Concrete Cutting and Sawing Magazine. Click here to read the article.
View More Photos
 